Friday 7 February 2014

Production Log

In this lesson we designed a production logs to help us keep track of the dates we are filming along with other things such as the props that we will need for each day, we have also hired one the schools DSLR cameras and a Stedi-cam for before we break up for the half term so that we can use it for filming up London. We decided which dates we would film on and which dates we would use to edit the film, find music and create some of the titles, this is only a type of plan so if we then decide to change dates for different reasons we will be able to as it is only a plan. From this we have decided as a group to film during the half term between the 17th and 21st of February because this is when we are all free as a group also the time we want to go up London to film is from 10 am to 3 pm so that we miss the peak times and will cost us less for travel.

From this we also discussed all the different props that everyone would need so we organised who was bringing what props-

Aaron (Me):
- Smart suit and tie
- Watch
- Umbrella

Laxmi:
- The briefcase or laptop bag

Hayley:
- Glasses
- Watch
- Handbag
- Lipstick

Also I will be keeping and transporting the camera and stedi-cam to location and back.

These are the first drafts of the production logs and what we started during the lesson:




These are our finished production logs after completing them in our own time as a group:







No comments:

Post a Comment